2024-06-21
ザ・ランドマーク名古屋栄/世界と人とまちをつむぐ価値創造拠点
A new landmark for Nagoya
A symbolic tower opens in Sakae
Located in a prime location in Sakae, Nagoya,
A new landmark will be born in 2026.
access
One of the most convenient locations for transportation in the Sakae area
On the ground,there are the main arterial roads of Otsu-dori, Nishiki-dori, Hisaya-odori, and Hirokoji-dori, as well as four inter-area roads.
The building is connected undergroundto Sakae Station and Sakaemachi Station, which are served by two subway lines and one private railway line.It is the only building directly connected to the ticket gates of Sakae Station on the Higashiyama Subway Line.
The area surrounding Sakae intersection where this project is located is
Recent redevelopment has seen it undergo a new transformation.
Above-ground and underground networks
The approach will take advantage of the location, surrounded by four major streets - Hisaya Odori, Hirokoji Dori, Nishiki Dori, and Otsu Dori - and will connect to the subway (Higashiyama Line and Meijo Line) and underground shopping mall (Daido Steel Phenix Square).By installing multiple escalators and elevators within the building, wewill create a pedestrian space where users can move freely between underground and above ground without any barriers.
Use composition
A concentration of four uses: hotels, offices, cinemas, and commercial facilities
floor plan
Single-sided core for high layout flexibility
We also accept small lots starting from 99.99 m2.
A pillar-free space that can accommodate layouts to suit various working styles
Realize a new work style.
View image
A panoramic view of downtown Sakae from a location surrounded by four major streets
Environmental friendliness and disaster prevention
[Environmental Considerations]
・The building is scheduled to achieve an S rank in the Nagoya City Built Environment Consideration System (CASBEE Nagoya).
・Ensuring that at least 20% of the planned site Area greened, and by greening the rooftop plaza, etc.,contributing to mitigating the heat island effect.
- District heating and cooling will be installed within the planned building to minimize energy loss.
・Works in conjunction with BEMS (Building Energy Management System) to achieve energy savings.
[Disaster prevention]
・This plan, which is part of the Fushimi-Sakae District Urban Renewal and Safety Assurance Plan, will include the installation ofmultiple Emergency Generator that will be able to supply power to both some of Common Spaces and private areasfor up to 72 hours in the event of a disaster.
Outline
Address: 2501-1, 2501-2, 2514Nishiki 3-chome, Naka-ku, Nagoya, Aichi Prefecture
Access: Directly connected to Sakae Station on the Higashiyama and Meijo subway lines
Primary Use Hotel, office, cinema, commercial, Parking Lots
Floors 41 floors above ground, 4 floors below ground, 1 floor in the penthouse
Structure: Above ground: Steel FrameUnderground: Steel Reinforced Concrete,
Reinforced concrete, Steel Frame
Building Building Height: approx. 211m
Developer: Mitsubishi Estate Co., Ltd., J Front Urban Development Co., Ltd.,
Japan Post Real Estate Co., Ltd.,Meiji Yasuda Life Insurance Co., Ltd.,
Chunichi Shimbun Co., Ltd.
Design: Mitsubishi Jisho Design Co., Ltd., Takenaka Corporation
Supervised by Takenaka Corporation
Construction: Takenaka Corporation
Site Area: approx. 4,866.40㎡ (approx. 1,472 tsubo)
Gross Floor Area: approx. 109,700㎡ (approx. 33,184 tsubo)
Rental Area: approx. 25,000㎡ (approx. 7,562 tsubo)
Air conditioning: 4-pipe multi-air conditioner
Elevator Shuttle ELV: 4 units
Low-rise elevators: 6, high-rise elevators: 4 (including wheelchair-accessible elevators)
Emergency and cargo ELVs: 2 units
Parking Lots 155 cars
(37 flat-bed units (including 10 for handling), 76 mechanical units (for wheelchairs)
(42 units)
Bicycle Parking 188 spaces (mechanical)
Standard Floor Area: approx. 1,576.27㎡ (approx. 476.82 tsubo)
Floor Load 500kg/㎡ (HDZ: 800kg/㎡)
Standard Floor Floor-to-Ceiling: 2,800mm
OA floorStandard Floor: 100mm
Power Outlet Capacity 60VA/㎡
Illuminance 500Lx
Expected Completion date: March 2026