2024-05-17
TENJIN TAIJU / A new landmark is set to be born in Tenjin, Fukuoka.
Located in a prime location in Tenjin
In a great location
At the end of May 2027, a new
A landmark is born
Natural wood from Kyushu is used for the exterior.
A hub for spreading new work styles
access
Starting with the subway Kuko Line "Tenjin" station,
Also on the Nishitetsu Tenjin Omuta Line and the Nanakuma Subway Line
Directly connected underground.
With various means of transportation by land, sea and air,
Not only in Fukuoka City,
Speedy delivery to various locations both domestically and internationally
Access is possible.
Use composition
Includes commercial, office and hotel elements
Mixed-use redevelopment.
"Work", "Play", and "Rest"
Contributing to a variety of scenes.
The office itself is attractive
In addition to the working environment, by linking it with other uses,
Workers' activities during and outside working hours
Enrich your office life.
floor plan
Each floor consists of approximately 2,600 square meters (approximately 790 tsubo).
Flexible spacethanks to the column-free design
The layout was implemented.
Additionally, the standard is 11 plots, with a maximum of 19 plots and a minimum of 1 span.
It can be divided into plots of approximately 30 tsubo (approx. 100 square meters).
Sample Layout
Ace Hotel
The lower floors (1st to 3rd floors) and upper floors (16th to 20th floors) have
Hotel brand in Seattle, USA
The opening of "Ace Hotel" has been decided.
From travelers to office workers,
Diverse people interacting with each other
It providesopportunities.
▲Exterior image (left: west side, right: east side)
*The hotel area is within the red dotted line. The hotel entrance and lounge are located on the lower floors on the east side.
BCP measures
Emergency Generator
Supply can be provided to both Common Spaces and private areas for up to 72 hours.
Disaster preparedness supplies
Disaster preparedness storage facilities are located on each Standard Floor to help you prepare for emergencies.
Seismic Performance
By adopting Seismic Damper, Seismic Performance is achieved that is more than 1.25 times greater than the value stipulated by the Building Standards Act.
A high level of safety is ensured.
Sustainability
100% renewable energy
The building owner purchases electricity generated from renewable energy sources.
This will make it possible to "occupy a building that is 100% powered by renewable energy."
Environmental certification
CASBEE Fukuoka A rank acquired.ZEB Oriented (office zone), CASBEE Wellness Office A rank,
The building is scheduled to receive LEED Gold certification (office area).
Wood Utilization
■More than 450 m3 of CLT panels manufactured by MEC Industry have been organically arranged on the exterior and eaves based on geometric calculations, contributing to a reduction in CO2 emissions of approximately 259 tons.
■A distinctive exterior appearance is achieved by arranging wood in an organic manner. The exterior plan combines high design quality with comfort through insulation.
Outline
*The contents of this web page and the renderings and drawings of the completed project are current as of May 2024 and are subject to change in the future.
Location: 1-326-1 Tenjin, Chuo-ku, Fukuoka City, Fukuoka Prefecture
Transportation:Nishitetsu Tenjin-Omuta Line "Nishitetsu Fukuoka (Tenjin) Station"
And Fukuoka CitySubway Airport Line "Tenjin Station"
Direct underground connection to Tenjin-Minami Station on the Nanakuma Line.
*Tenjin Underground Shopping Mall, adjacent to One Fukuoka
Building,Inaba-machi Streetunderground passage and
Eachconnection is planned.
Primary Use Offices, hotels, shops, Parking Lots
Floors 21 floors above ground / 4 floors below ground
Structure above ground: Steel Frame
Basement: Steel Reinforced Concrete
The building is approximately 91 meters Building Height.
Project owner: Mitsubishi Estate Co., Ltd.
Architectural Design and Supervision by Mitsubishi Jisho Sekkei Co., Ltd.
Gross Floor Area: approximately 73,960 m² (approximately 22,372 tsubo)
Rental Area approximately 26,508 m2 (approximately 8,019 tsubo)
Air conditioning: Air-cooled chiller + air-cooled multi-zone air conditioning (PAC)
BCP seismic isolation Structure / natural ventilation sashes / flood barrier /
Disaster preparedness storage rooms on each floor
Building-Emergency Generator
(2,500kVA x 1 + 70,000L tank)
Emergency Generator room for tenants + 20,000L tank
Parking Lots 82 cars
(Two of these spaces are wheelchair accessible, and access is via the adjacent building.)
Standard Floor Area 7Fto 15F: Approx. 2,600㎡ (Approx. 790 tsubo)
*Minimum approximately 100㎡ (approximately 30 tsubo)
Floor Load: 500 kg/m² (HDZ: None)
Floor-to-Ceiling 2,800mm
Ceiling system: 600mm square grid system
100mmraised access floor
Power Outlet Capacity 50VA/m²
*15VA/m² supply from the building in case of emergency.
Illuminance 500Lx
Completion scheduled for the end of May 2027 (tentative)





















