2023-10-11
Grand Green Osaka
District Area approximately 9 ha
A futuristic city fused with greenery is born
Early opening of town in September 2024, office Completion at the end of November
Centered around a vast green space, the area is home to offices, commercial facilities, etc.
Gran Green Osaka is a complex that brings together a wide range of functions.
Creating new innovations that can only be realized here
The next generation of workspace is born.
An urban park (45,000m2) directly connected to JR Osaka Station will be developed through public-private collaboration.
Created by seamlessly connecting a lush park and offices,
We will realize a new way of working unique to Grand Green Osaka.
You can't get it from an office where you just work or a park where you just relax.
Create new inspiration and ideas.
Including JR Osaka Station
7 stations and 15 routes * Available
In March 2023, “JR Osaka Station (Umekita Underground Exit)” will open.
Opened at the entrance of Grand Green Osaka.
You can directly access the office lobby from the ticket gate.
Kansai International Airport and Osaka International Airport are gateways to Japan and overseas,
It also has good access to Shin-Osaka Station.
*Includes the Naniwasuji Line, scheduled to open in 2031.
Gran Green Osaka Park Tower/Gate Tower
Two types of officesavailable to meet all your needs
■Grangreen Osaka Park Tower
One of the leading office towers in western Japan, boasting Standard Floor of approximately 1,250 tsubo.
The bank is divided into high, mid and low floors, andthe office lobby on the second floor
You can move smoothly to each floor.
■ Gran Green Osaka Gate Tower
Standard Floor 1550m2.
Each floor can be accessed fromthe basement, first floor, and second floor.
This is a rare office space that can accommodate visitor-based businesses.
Gran Green Osaka Park Tower
One floor of approximately 1,250 tsubo,one of the largest office towers in Kansai
With one of the most expansive office spaces in Kansai,
We offer a variety of workspaces to suit a wide variety of companies and work styles.
In addition, the floor can be divided into smaller units of approximately 34 tsubo to meet all needs.
The lower floors offer a panoramic view of the greenery of the park, while the upper floors offer panoramic views of Osaka city and the Yodogawa River.
Subdivision plan Layout plan
Gran Green OsakaGate Tower
Gran Green Osaka Gate Tower is close to the station.
It matches the business style of many visitors.
Base The second floor is a pillar-free space measuring approximately 1550m2.
The floor shape allows for up to five divisions,
This allows for flexible office layouts.
The reception area has an open feel that makes the most of the park view.
A conference room is also available.
layout plan
Interviews with tenant companies
Honda's new software development center will create new value in the futuristic city of Gran Green Osaka.
A cafe lounge and terrace that are "connected to the greenery" and a dining lounge that "looks up at the sky" create a
"Sorappa", a lounge space for employees, has opened on the 4th floor of Gran Green Osaka Park Tower.
Working in Gran Green Osaka allows you to live in harmony with nature.
We aim to provide essential comfort and promote rich communication.
Sustainability
1. environmental certification
◆FY2021 Ministry of Land, Infrastructure, Transport and Tourism leading project for sustainable buildings, etc.
Selected as (CO2 reduction leading type)
◆ Obtained LEED-ND GOLD certification (plan certification)
◆ Obtained CASBEE Smart Wellness Office S class
◆ Obtained CASBEE Osaka Mirai S class environmental certification
2. Initiatives for SDGs
Grand Green Osaka's efforts are aimed at achieving the 17 goals of the SDGs.
Of these, contributed to 12 items.
3. CO2 reduction
CO2 emissions were reduced by 35% through initiatives such as aquifer heat storage, biogas power generation, sewage heat/geothermal heat utilization, and district heating and cooling.
Outline
*The contents of this web page, as well as renderings and drawings, are current as of August 2023, and are subject to change in the future.
Address: 5-54, Ofukacho, Kita-ku, Osaka City, Osaka Prefecture
Gran Green Osaka Park Tower, Gate Tower
Access: Directly connected to JR Osaka Station
Hankyu Railway and Hanshin Railway "Osaka Umeda Station",
Osaka Metro lines: Umeda Station, Nishi-Umeda Station,
"Higashi Umeda Station",JR Line "Kitashinchi Station"
Both are available via the underground passage.
Architectural Design and Supervision: Mitsubishi Jisho Design, Nikken Sekkei, Obayashi Corporation, Takenaka Corporation
Supervision: Mitsubishi Jisho Design and Nikken Sekkei
Completion End of November 2024
Primary Use Offices, commercial facilities, hotels, core functions, residential
Floors Gran Green Osaka Park Tower: 39 floors above ground, 3 floors below ground
Gran Green OsakaGate Tower: 18 floors above ground, 3 floors below ground
Structure: Steel Frame (CFT columns)
Underground: Steel Reinforced Concrete, steel and reinforced concrete
Building Building Height Gran Green Osaka Park Tower: Maximum height approx. 180m
Gran Green Osaka Gate Tower: Approximately 90m high
Site Area 25,260㎡ (approx. 7,640 tsubo)
Total rental Area Gran Green Osaka Park Tower: approx. 93,000 m2 (approx. 28,000 tsubo)
Gran Green Osaka Gate Tower: Approximately 20,000 m2 (approximately 6,000 tsubo)
Floor Load 500kg/m2 (heavy duty zone: 800kg/m2)
Office Floor-to-Ceiling 2,800mm
OA floor 100mm
Power Outlet Capacity 50VA/㎡
Elevators Gran Green Osaka Park Tower: 8 low-rise, 6 mid-rise, 8 high-rise
Gran Green Osaka Gate Tower: 6 units
Air conditioning equipment: Compact air conditioners on each floor + VAV system (with some exceptions)
BCP ・Cogeneration provides power during commercial power outages
Ifgas is available, electricity can be supplied.
・The building's Emergency Generator supplies and
Can supply power for 72 hours even in the eventof a gas outage
(Exclusive area supply: 15VA/m2)
・Installation space for Emergency Generator for tenants
Secured(300kVA x 4 units)
Parking Lots Approximately 80 flat parking spaces, approximately 120 two-tier parking spaces (60 x 2 tiers)






















