(Provisional name) Yokohama City Naka Ward Kaigandori Project (A-1 District)
Location
A 4-minute walk from Bashamichi Station on the Yokohama Minatomirai Line, with access to 4 stations and 3 lines.
Administrative facilities such as Yokohama City Hall and Kanagawa Prefectural Government Office arewithin walking distance.
Many historical buildings remain in this area, allowing you to feel the history of the port city of Yokohama.
Redevelopment is also underway in the surrounding areas, and further increases in visitors are expected in the future.
[Development status of surrounding areas]
Redevelopment of the Kitanakadori North area and the Kannai Station area (development of offices, housing, hotels, commercial facilities, etc.)is in progress
❶ Utoku Head Office Building Plan (1st floor commercial space (planned)): Completion in January 2025
❷ Kitanakadori North District A1/2 Project (residential, hotel, etc.): Scheduled for Completion 2027
❸ Kitanakadori Kita B-1 District Project (residential, office, commercial, etc.): Scheduled for Completion 2027
❹ BASEGATE Yokohama Kannai (Yokohama City Old City Hall District Utilization Project / Offices, commercial facilities, hotels, etc.): Scheduled Completion in 2025
❺ Kannai Station Minatomachi District Type 1 Urban Redevelopment Project (offices, commercial facilities, residential areas, nightlife venues, etc.): Scheduled Completion in 2030
❻ Kannai Station North Exit Area Type 1 Urban Redevelopment Project (offices, commercial, residential, etc.): Scheduled Completion in 2030
Shinkansen and airplanes
Smooth availability
Great access to accelerate your business
It is 12 minutes to Shin-Yokohama Station and 34 minutes to Haneda Airport.
Access to major stations in the city center is also smooth, with Shinagawa Station only 23 minutes away and Tokyo Station only 31 minutes away.
Application composition
A highly functional office buildingwith harbor views from every floor
The offices are divided into high-rise and low-rise banks,allowing for smooth movement from the first-floor office entrance to each floor.
The entrance is made of wood, providing a sense of warmth and comfort to workers and visitors.
We plan to attractconvenience stores, cafes, restaurants, etc.to the first floor, supportinga convenient and comfortable office life.
Along the seafront, it is integrated with the adjacent blocks.
A promenade will be constructed.
You can relax while feeling the sea and greenery at the same time.
We plan to create an outdoor space where this is possible.
floor plan
Efficient layout
Possible to make column-free
Open floor plate
An open office space with Floor-to-Ceiling of 2.8m.
From the large windowsyou can enjoy a panoramic view of Yokohama's ocean.
Natural light pours in, creating a spacious and comfortable workspace.
BCP measures
■ Emergency Generator installed on the roof (15VA/m², can operate continuously for 72 hours)
■As an additional BCP measure, space has been secured for additional Emergency Generator for tenants.
■Set up an emergency stockpile warehouse and secure space to store food, drinking water, cold weather gear, etc.
■In order to ensure that the building can maintain its functionality even in the event of a tsunami, the important equipment Mechanical Room was not located in the basement but on the third floor.
In addition, flood barriers have been installed in case of an emergency.
■ Adopts Seismic Damper to reduce damage caused by earthquakes and strong winds
Environmental performance
■By implementing comprehensive environmentally friendly initiatives,we plan to obtain an A rank in the CASBEE Yokohama assessment.
■LED Lighting used throughout the building
■ Numerous EV charging stations will be installed in Parking Lotsto support EV use by tenant companies.
■ A greening rate of 15% (1.5 times the city standard)will be secured in conjunction with the plaza space of the adjacent block.
■ Wood with a low environmental impact is usedfor office entrances, elevator halls, etc.
Outline
*The information on this website and the renderings and drawings of the completed project are current as of February 2025 and are subject to change.
Location 3-9-4 Kaigan-dori, Naka-ku, Yokohama City, Kanagawa Prefecture
Access 4-minute walk from Bashamichi Station on the Minatomirai Line
6 minutes walk from Nihon-odori Station
11 min. walk from "Sakuragicho" station on JR and Yokohama Municipal Subway Blue Line
11 minutes walk from Sakuragicho Station
Yokohama Municipal Subway Blue Line
8 min. walk from "Kannai" station
11 min. walk from "Kannai" station on JR line
Primary Use Office, Store
Floors 21 above ground / 1 basement level / 1 tower
Structure Above Ground: Steel Frame (CFT and S columns)
Basement: Steel Reinforced Concrete
Building Building Height approx. 100m
Owner: Naka-ku Kaigan-dori Development Special Purpose Company (Mitsubishi Estate Co.
Special Purpose Company (Mitsubishi Estate Co,
Kajima Corporation)
Architectural Design and Supervision Mitsubishi Jisho Sekkei Co.
Construction Kajima Corporation
Site Area Approx. 4,944m2 (approx. 1,496 tsubo)
Gross Floor Area Approx. 70,000 m2 (approx. 21,175 tsubo)
Rental rooms Area Approx. 43,000 m2 (approx. 10,007 tsubo)
Air conditioning Individual Air Conditioning
Elevators Passenger: 12 (6 each for low-rise and high-rise)
Emergency and manned: 2 units
Parking Lots 195 units
(9 flat-mounted, 186 in tower)
Cargo handling: 10 units
Floor Load 500 kg/㎡ (HDZ: 800 kg/㎡)
Floor-to-Ceiling 2,800mm
OA floor 100mm
Power Outlet Capacity 50VA/m2
Completion End of Jan. 2027 (scheduled)