2022-07-22
Otemachi Gate Building
Located at the gateway to OtemachiSymbol tower of Kanda area
The open office entrance with a three-story atrium uses a lot of natural wood.It creates a space that is both dignified and warm.
An exchange plaza that brings new excitement
A pedestrian bridge will be built over the Nihonbashi River and a plaza of approximately 1,000 square meters will be created.
In addition to strengthening the pedestrian network that connects Otemachi Naka-dori Ave. and improving the ease of getting around,
We will create a lively waterside space by developing a pier.
building plan
A location that enjoys a variety of access with 2 stations and 9 lines
Approximately 3 minutes walk from Otemachi Station on the Tokyo Metro Marunouchi, Tozai, Chiyoda, Hanzomon, and Mita Lines
Approximately 6 minutes walk from Kanda Station on the JR Keihin-Tohoku/Yamate/Chuo Line and Tokyo Metro Ginza Line
floor plan
high degree of freedom
Tailored to diverse work styles
Realize the layout
<Sample layout>
Plan A: An office with an open feel that is seamlessly connected using two floors.
Plan B: Island-style office with an emphasis on space efficiency.
Ensuring high safety even in the event of a disaster
Complete BCP measures and advanced Seismic Damper
Even in the event of a disaster, it is possible to supply 100% of the normal power, ventilation *1, and hygiene *2 functions for 72 hours to both private and Common Spaces
Two 1,750kVA Emergency Generator will be installed to support business continuity.
In addition, by adopting a hybrid Seismic Damper that uses an unbonded brace and an oil damper,
It reduces the shaking of a wide range of earthquakes and ensures high safety.
*1 Excludes air conditioning in principle*2 Assumes 30% of staff present at the time of disaster
Outline
*The CG image of the completed exterior shown here is a composite of a photo of the area taken in March 2022 and a CG image of the completed building exterior drawn based on drawings at the planning stage, and may differ from the actual building. There are some facilities and equipment that have not been reproduced. The plants are not drawn with any particular season or condition in mind when you move in.
*The cross-sectional diagram shown is based on drawings at the planning stage and may differ from the actual one. Additionally, Area may change due to legal revisions, design changes, etc.
Address: 1-16 Uchikanda Chiyoda-ku, Tokyo
Transportation: Tokyo Metro/Toei Subway "Otemachi Station"
3 minutes walk from
From Kanda Station on the JR and Tokyo Metro Ginza Lines
6 minutes walk
Primary Use Offices, shops, business and industrial support facilities,
Parking Lots, etc.
Floors 3 basement floors / 26 floors above ground / 2 penthouse floors
Structure: Steel Reinforced Concrete, partial Steel Frame,
Reinforced concrete structure, ground floor: Steel Frame
Building Building Height: approx. 130m
Architectural Design and Supervision: Mitsubishi Jisho Sekkei Co., Ltd.
Construction Taisei Corporation
Site Area approximately 5,100 m2 (approximately 1,543 tsubo)
Building Area: approximately 3,307 m2 (approximately 1,000 tsubo)
Gross Floor Area: approx. 85,267 m2 (approx. 25,793 tsubo)
Total rental Area approx. 29,190.74㎡ (approx. 8,830.22 tsubo)
LED Lighting Lighting daylight control system installed
Air conditioning: Each floor -zoned HVAC and VAV System
Elevatorlow bank 6 units, mid bank 4 units,
6 high-rise banks, 1 VIP, 1 business
2 for industrial support facilities, 2 for emergency use and passenger/cargo use
Parking Lots approximately 150 cars
Standard Floor Area 12F to 16F: Approximately 2,057.73㎡ (approximately 622.46 tsubo)
(Office) 17F to 20F: Approximately 2,065.97 m2 (approximately 624.96 tsubo)
21F to 25F: Approximately 2,074.21㎡ (approximately 627.45 tsubo)
Floor Load 500kg/㎡
Floor-to-Ceiling: 2,900mm
OA floor 100mm
Power Outlet Capacity 50VA/㎡
Illuminance 500Lx
Scheduled Completion date: End of July 2026